Education
No degree, certificate or diploma
Work site environment
Dusty
Work setting
Various locations
Tasks
Inspect, measure and mark surfaces to be coveredPrepare flooring plans and schedulingMeasure, cut and install resilient floor coveringsPrepare and install hardwood floorsConduct moisture, ph, temperature and other tests prior to flooring installationsEstimate costs and materialsPrepare floors for installationsRemove existing floor coverings and contaminantsInstall carpeting on walls or other surfacesPerform direct glue-down carpet installationsInstall vinyl decking materials
Installation specialization
Vinyl or resilient tilesVinyl or resilient sheetsHardwood strip flooringHardwood intricate patterns flooringLinoleum
Transportation/travel information
Willing to travel
Work conditions and physical capabilities
Physically demandingBending, crouching, kneeling
Own tools/equipment
ToolsHard hat
Personal suitability
OrganizedTeam player
Screening questions
Are you available for shift or on-call work?
Employment terms options
Early morning
Experience
1 year to less than 2 years
Employment terms options
ShiftMorningOn callDayOvertime available
Other benefits
Team building opportunities
Durée de l'emploi: Permanent
Langue de travail: Anglais
Heures de travail: 32 to 35 hours per week